Tumut

High End Luxury Residential Dwelling with Pool

Construction Timeframe: 12 months

A tactile and raw material palette, coupled with high end fixtures, fittings and architectural details required careful planning and supervision to ensure the vision of the architect and clients were met and exceeded.